product_image_name-Cable-10M HDMI Cable High Speed Long Lead Full HD 1080P Tv Laptop PC Monitor Cctv-Black-1

Share this product

Cable 10M HDMI Cable High Speed Long Lead Full HD 1080P Tv Laptop PC Monitor Cctv-Black

UGX 75,000
UGX 100,00025%

5 units left

+ shipping from UGX 1,900 to Central Business District
Variation available

Promotions

Delivery & Returns

Choose your location

Pickup Station

Delivery Fees UGX 1,900
Arriving at pickup station on 08 June When you order within the next 4hrs 40mins Ensure you pickup your order within 5 business days

Door Delivery

Delivery Fees UGX 3,000
Estimated delivery on 08 June When you order within the next 4hrs 40mins Our delivery agent will contact you on the day of delivery

Return Policy

Free return within 7 days for eligible items.Details

Seller Information

Bonic cctv

86%Seller Score

21 Followers

Follow

Seller Performance

Order Fulfillment Rate: Excellent

Quality Score: Excellent

Customer Rating: Average

Product details

High-Speed HDMI to HDMI Long Lead with Ethernet and ARC (Audio Return Channel), This HDMI cables are made to the highest standards and featuring copper cable and double shielding to ensure smooth data transmission with no interference. Good for long for extending your HDMI signal to other areas of the home or office.

Has a durable PVC jacket for easy routing in challenging areas compatible with a range of devices that support HDMI. A perfect match for Cctv, Free view/Free sat and HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors.

Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Return Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths

Specifications

Key Features

  • Compatible with any device with a HDMI port.
  • High-speed networking to an HDMI link, allowing users to take full advantage of their IP-enabled devices without a separate Ethernet cable.
  • Allows an HDMI-connected TV with a built-in tuner to send audio data "upstream" to a surround audio system, eliminating the need for a separate audio cable.
  • Defines input/output protocols for major 3D video formats, paving the way for true 3D gaming and 3D home theatre applications.
  • Real-time signaling of content types between display and source devices, enabling a TV to optimize picture settings based on content type
  •  Adds support for additional color models used in digital photography and computer graphics.
  • Affordable

What’s in the box

1 x 1 10m cable

Specifications

  • SKU: CA246EA0F725LNAFAMZ
  • Product Line: 1
  • Model: 1080p
  • Production Country: China
  • Size (L x W x H cm): 10
  • Weight (kg): 300
  • Certifications: Eco Friendly
  • Color: Black
  • Main Material: cables
  • Shop Type: Jumia Mall

Customer Feedback

This product has no ratings yet.

Cable 10M HDMI Cable High Speed Long Lead Full HD 1080P Tv Laptop PC Monitor Cctv-Black

Cable 10M HDMI Cable High Speed Long Lead Full HD 1080P Tv Laptop PC Monitor Cctv-Black

UGX 75,000
UGX 100,00025%
Questions about this product?

Recently Viewed

See All